Abstract

Manufacturing efficiency improvement can be achieved by different means, e.g., effective load of equipment, reduced manufacturing time, production cost decrease and Lean manufacturing. The paper reviews the mentioned improvements and focuses on production scheduling aimed to reduce the overall production time. The sequence of simultaneous launch for production is often not considered, but it affects the overall production time. The elaborated production sequence eliminates waste waiting time, reduces production cost and manufacturing time, and thus improves the manufacturing efficiency.The authors propose to apply a software agent, which is engaged with production scheduling and production process improvement that includes the following tasks: effective workload of equipment, production lead-time decrease, organization of continuous product flow on production department. The agent uses such priority levels, as order deadline and class affiliation of ABC analysis in its production scheduling.The paper presents a case study on elaborated production scheduling for manufacturing efficiency improvement.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.