Abstract
This paper deals with the scheduling of operations in a Steelmaking and Continuous Casting (SM-CC) plant. In particular, we consider a real case study of an integrated plant located in the North of Italy. First, we describe in details the SM-CC process of the considered system by using the Unified Modeling Language. Second, we focus on the schedule of casts on the continuous casting machine that is subject to different types of setup operations. With the objective of minimizing the maximum completion time, the schedule of the continuous casting machine is modeled by a Mixed Integer Linear Programming formulation. An example enlightens how a proper scheduling of the casts is of basic importance to obtain good system performances.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.