Abstract
The authors develop production scheduling algorithms for semiconductor test operations. The operations in the facility under study are characterized by a broad product mix, variable lot sizes and yields, long and variable setup times, and limited test equipment capacity. The approach presented starts by dividing the facility or job shop into a number of work centers. The method then proceeds to sequence one work center at a time. A disjunctive graph representation of the entire facility is used to capture interactions between work centers. The introduction of different management objectives leads to different work center problems and different production scheduling algorithms. The authors present algorithms for two different work center problems. Direction for future research are discussed. >
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.