Abstract

Accurate estimation of construction production, which is composed of productivity and unit costs, allows construction planners and managers to have excellent control over current processes and to correctly predict the production of similar projects in the future. Due to the need for accurate production estimation, selection of the appropriate construction technology is a critical factor in the success of a project. This paper presents a methodology for developing a model capable of predicting productivity and unit costs using several procedures, such as actual data collection, input data generation using construction simulation, and multiple regression analysis. An earthmoving operation was analyzed to estimate the proposed methodology’s prediction of construction production. A global positioning system (GPS)–based earthmoving system was selected as the new construction technology to be compared with the conventional system, to evaluate the decision-making process at a jobsite. The proposed methodology is expected to provide users with a basis for selecting appropriate technology. The case study presented in this paper demonstrates how to utilize the proposed methodology and analyze its predicted results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.