Abstract

Early flexible manufacturing system (FMS) production planning models exhibited a variety of planning objectives; typically, these objectives were independent of the overall production environment. More recently, some researchers have proposed hierarchical production planning and scheduling models for FMS. In this article, we examine production planning of FMS in a material requirements planning (MRP) environment. We propose a hierarchical structure that integrates FMS production planning into a closed-loop MRP system. This structure gives rise to the FMS/MRP rough-cut capacity planning (FMRCP) problem, the FMS/MRP grouping and loading (FMGL) problem, and the FMS/MRP detailed scheduling problem.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call