Abstract

This paper deals with a short-term production plan of a single toolset during a shift at a semiconductor fabrication plant. We propose a cost-based optimization model that seeks to minimize the cost of the shift while meeting the following conditions: 1) the shift produces its required output, measured in work-in-process (WIP) levels; 2) preventive maintenance (PM) tasks are carried out in compliance with the manufacturer's recommended PM policy; and 3) the equipment undergoes cleaning operations, as recommended by the manufacturer, in a way that minimizes the production of blank wafers (a by-product of the cleaning process). A linear programming model is formulated and a practical procedure is provided to solve this production plan problem. Data from a real fab are used to demonstrate the optimality and applicability of the proposed approach. Results of various sensitivity analyzes further demonstrate how the model can be used to analyze the impact of changes in cost parameters, WIP levels and production rate parameters on the optimal solution.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.