Abstract

This study investigates the well named X (for confidential reasons) of the field called Y which initially was productive with the natural energy of the reservoir of the oil in the absence of water. After a few years of production, water began to overflow excessively in the well. The goal of this paper is to maximize the oil production in an oil well X by reducing water ingress. The Pressure Volume Temperature (PVT) data, completion data, and reservoir data are analyzed via PIPESIM and Excel software by using the nodal analysis method to get the well performance and decline curve for predictions. Two scenarios are considered: firstly, to install an electric submersible pump (ESP) to activate the X well and secondly to make a new perforation. The ESP is installed at 11300 ft where the water production flow rate is 5586.264 STB/d and the oil production flow rate is 1396.566 STB/d. The new perforation is installed at 12038 ft where the water production flow rate is 277.1693 STB/d and the oil production flow rate is 5543.387 STB/d. To have the optimal parameters, the sensitivity analysis is applied to the flowline diameter and the wellhead pressure. The optimal parameter values obtained are 308.6128 STB/d for the water production flow rate and 5863.643 STB/d for the oil production flow rate. The new perforation is appropriate because this scenario allows water reduction, oil production maximization, profitability of 98086854 $, and a return on investment in 5 months during 16 years of production.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call