Abstract

Fragmental rock accumulates around the perforation channel and the permeability of this zone decreases during drilling. Underbalanced drilling cleans the perforation channel and increases oil production. A superlight Saraline drill-in fluid produces a pressure differential. Glass bubbles (GB) were used to reduce the density of this fluid. The required viscosity and stability of the fluid were maintained by adding homogenizing and stabilizing agents. Laboratory tests showed that the density of the fluid with a Saraline: GB mass ratio of 60:40 and a homogenizing and stabilizing agent content of 3 and 9 wt. can be 500 kg/m(3), i.e., much lower than the density of pure Saraline, 722.2 kg/m(3).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.