Abstract

This paper is intended to formulate the so-called production lead time problem as the problem of throughput optimization under a constraint on production lead time. A solution is provided for serial lines with Bernoulli machines and infinite buffers. Specifically, analytical formulas are derived for raw material release rates, which guarantee the desired lead time, while maximizing the throughput. Based on this solution, a method for selecting design parameters of kanban- and CONWIP-controlled systems, which ensure the desired lead time, is provided.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.