Abstract

To solve the dynamic and complex problem of production scheduling, this paper proposed a new production dynamic scheduling method based on improved contract net of multi-agent. In this method, a production dynamic scheduling framework model based on multi-agent was built, and each agent function was analyzed in detail. An improved contract net was investigated by means of spirit parameters. By means of improved contract net, the negotiation procedure between scheduling negotiation agent and resource agent was constructed by improved contract net multi-agent. Finally, the simulation system of production dynamic scheduling based on improved contract net of multi-agent was demonstrated and validated by QUEST software. It has shown the proposed method can improve the benefit of production scheduling, and provide a support for adapting to complex and dynamic production scheduling.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.