Abstract

Tarakan Field, North Kalimantan is a part of PT. Pertamina EP Asset 5. The Tarakan Field has 5 structures in the form of Pamusian, Juata, Sesanip, Mangatal, and Sembakung. The Tarakan Field has 57 production wells and 6 injection wells. The wells at Tarakan field are produced with artificial lifts in the form of Sucker Rod Pump (SRP) totaling 25, Hydraulic Pumping Unit (HPU) totaling 11, Electric Submersible Pump (ESP) totaling 19 and Progressive Cavity Pump (PCP) totaling 2. The determination of artificial lifts is carried out by the design of well characteristics and production history. The design at Tarakan Field was carried out with an artificial lift in the form of ESP (Electric Submersible Pump). ESP is used according to reservoir and formation characteristics in Tarakan Field.
 Water Control Diagnostic Plot is a method used to analyze the effect of control on produced water. Water Control Diagnostic plot is plot between WOR and WOR derivative vs time. The plot was carried out on a log-log scale. The plot on the Water Control Diagnostic Plot is then analyzed against the graph created by the KS Chan. So from the analyzed plot, it is found whether or not there is a problem in the well at Tarakan Field. The results of the graph analysis on the well at Tarakan Field on the chart show that the field does not indicate a problem.
 
 Keywords: chan plot; design; esp; production

Highlights

  • The Tarakan Field is located in North Kalimantan

  • In the previous period from 1992 to 2008 Tarakan Field ownership was owned by Medco / TAC Exspan

  • Oil production at Tarakan Field is carried out using an artificial lift

Read more

Summary

Field Review

Tarakan Field changed ownership in several periods from 1905 to the present. In the previous period from 1992 to 2008 Tarakan Field ownership was owned by Medco / TAC Exspan. In 2008 until now the Tarakan field is owned by Pertamina. The actual total production rate every month in the Tarakan field is 2902,182 BOPD. The Tarakan Field has 57 production wells and 6 injection wells. Oil production at Tarakan Field is carried out using an artificial lift. The use of SRP in Tarakan Field is 25 units, HPU is 11, ESP (innovation) is 19 and PCP is 2. Production of wells in the Tarakan Field is carried out with an artificial lift supported by Workover and Well Service programs at the well to optimize production

Literature Review
Pump Design
Water Control Diagnostic Plot
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call