Abstract
Production and preventive maintenance rates control in a failure-prone manufacturing system (FPMS) was studied in the current survey. One of the most important parameters is to determine the inventory level of the buffer, because if the inventory level is low, the system is faced with shortage in time of breakdown; otherwise, holding cost will be increased. Another effective parameter is determining the time for preventive maintenance which is important to discover breakdowns before their occurrence and thus minimise the cost of corrective maintenance. The purpose of this paper was to determine the optimal production rate and time of preventive maintenance for a single-machine FPMS to minimise sum of costs of holding, shortage, corrective and preventive maintenance. The repair time and time between breakdowns have general distribution. Since the inventory level and time of preventive maintenance should be optimised simultaneously in order to obtain an optimum point, discrete event simulation and simulated annealing were used.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Manufacturing Technology and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.