Abstract

Since a semiconductor foundry plant manufactures a wide range of memory and logic products using the make-to-order business model, the product mix is an important production decision. This paper first describes the characteristics of the product mix planning problem in foundry manufacturing that are attributable to the long flow time and queuing network behaviors. The issues of time bucket selection, mix optimization and bottleneck-based planning are next addressed. A decision software system based on integer linear programming techniques and a heuristic procedure have been implemented for mix planning. It was determined that the suitable time bucket of planning is either one week or one month and the lead-time offset factor should be included in the logic of workload calculation. This paper also presents various facets of product mix decisions and how they should be integrated with operations management.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.