Abstract

At the biggest sewage treatment plant of Niersverband methane gas is recovered from surplus digestion gas and injected into low pressure public utility pipeline in compliance with low calorific natural gas quality standards. The necessary surplus gas yield availability is evaluated. The variations of supply to utility and the probability of peak load capacity running time are displayed. Operation expenditures costs and economy are evaluated. Utilization of 1,6 Million m3/a processed biogas is expected.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.