Abstract

This thesis introduces the main process flows of holding pole lifting and supporting pole installation during the tower erection by combining the landform features of “high mountains and highlands in Eastern Tibet and Western Sichuan Province” of power transmission and transformation of grid networking between Changdu of Tibet and Sichuan Province, aiming at the problem that that the line stringing of holding pole is influenced by landforms of cliff, etc. and adopting light combined compound-material holding pole as lifting mechanism, to solve the tower erection at the tower positions like cliff and isolating mountains where traditional holding poles cannot be erected effectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.