Abstract

This paper deals with analysis of energy consumption of Ukrainian bromine plant. Process integration allows reducing the energy consumption on 1.5 MW by heat recovery. It is achieved by improvement of recuperative heat exchangers network. Additionally heat recovery may be increased by multistage evaporation of sodium bromide and ferrous chloride. Increase the heat recovery leads utility reduction. This is not only heating and cooling duty but also power pumping and pipe heat losses. The investment for retrofit project is about 757 100 € and payback period about 2 years.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.