Abstract

Commissioning for a UTSP plant has been started for commercial production at Tangshan Iron & Steel Company Ltd in China. The plant was constructed by an international consortium from Japan, Italy and the USA, and production of hot coils has been begun in only 25 months. The annual production capacity for the first stage is 1.5 million tons and strip thickness ranges from 0.8 to 4.0 mm. The plant is featured by a high-performance PLC system and advanced process control technologies, with which semi-endless rolling operation was introduced for the first time in China. This paper describes these features and functions in detail.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.