Abstract
Aim. This study aims to develop a scientific and practical tool for assessing the influence of the effectiveness of the district system of modernizing and current maintenance of railway tracks.
 Methods. To evaluate the process of introducing modern breakthrough technologies in terms of determining the time costs of work and the degree of their modification, the mathematical modeling method of business processes is used.
 Results. A model of the organization of the mechanized process of capital overhaul of the track was developed, and the economic efficiency of using satellite navigation during capital overhaul of the track was calculated.
 Conclusion. The introduction of digital technologies to control the depth of the ballast prism cutout during the operation of gravel-cleaning machines relative to the adjacent track successfully replaces the labor process of measuring with a horizontal rail with a leveling under the inner thread of the repaired track, excludes technological stops of machines, and reduces the time of work of machines and personnel and operational costs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.