Abstract

Abstract The aim of the paper was to analyse problems related to the inventory (as-built survey) of low and medium voltage power lines. Measurement methods and techniques were analysed as well as the influence of the network type (low and medium voltage) on the as-built survey procedure. For this purpose, information obtained from five as-built survey reports of medium and low voltage using different measurement methods was also used. Three of them were sample as-built survey of low voltage cable lines measured by tacheometric method, one as-built survey of medium and low voltage lines measured by GNSS method and one of low voltage cable made by indirect method using cable locator and measured by GNSS technology. The paper analyses the differences arising from the accuracy of the measurement, the difficulties encountered during the implementation, the time-consuming nature of the work performed, taking into account safety aspects for the persons performing the work.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.