Abstract

The features of the structures of complex monolithic reinforced concrete structures are given, the necessity of their organizational and technological design to ensure quality, reduce the duration and safety of construction and installation works is substantiated. A fragment of the formwork for complex curvilinear beams is presented, where the permanent and temporary loads, the permitted steps of the main and secondary beams and remote scaffolds for the PERI and CRAMOS modular formwork systems, which are more common in RA, are calculated in detail.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call