Abstract

The features of the structures of complex monolithic reinforced concrete structures are given, the necessity of their organizational and technological design to ensure quality, reduce the duration and safety of construction and installation works is substantiated. A fragment of the formwork for complex curvilinear beams is presented, where the permanent and temporary loads, the permitted steps of the main and secondary beams and remote scaffolds for the PERI and CRAMOS modular formwork systems, which are more common in RA, are calculated in detail.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.