Abstract

The article analyzes problems of design and development of advanced superheavy launch vehicles. Mass and energy characteristics and design layout of launch vehicles are substantiated. Delivery methods of bulky superheavy launch vehicle components to the spacecraft launch site are discussed. Methods of reduction of financial and technical risks of development and operation of superheavy launch vehicles are analyzed. The problem of environmental impacts of superheavy launch vehicle launches is posed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call