Abstract
Aiming at dealing with the problems of design, debug, and operation that occurred in the condensate polishing system, the paper put forward the problems of the high concentration of oxygen at the outlet of the condensate pump, pollution of the prefilter, the presence of remaining resin in the upper water cap of the high speed mixed bed, condenser leakage and abnormal shutdown of the turbine through the data analysis of condensate polishing system in Taishan Power Plant, diagnostic analysis of all these problems was performed and appropriate solutions were put forward.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.