Abstract

The Precast industry is booming industry now a day, but then also the implementation ratio of precast member in residential construction work is not up to the mark. As we all know that precast having numerous advantages over the cast in situ construction method, for example it saves the total time of construction which indirectly reduces the cost of construction but still we are lagging behind in implementation of precast in it. In this research we have listed out some problem which can be cause of less implementation of precast in residential construction buildings. As discussed in paper, there are so many factors are affected on Implementation of Precast in Residential Construction Sector For example: Technical Issues and General Issues. In Technical Issues Joint stability problem during Erection, Standard size of precast element, Leakage Issues, Design change related problem, Requirement of Standard Rate per Panel, End user Profit, Additional Taxes, General Issues are: Transportation of Precast Element, Loading and Unloading problems, Transportation to sight, Storage Area, Skilled Labour Research has done and data is collected through Questionery survey, Field survey, and research survey.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.