Abstract
Probabilistic time estimation is an essential part of proper risk management in tunneling projects. In recent decades, several models have been developed for this purpose, one of which was developed by Isaksson and Stille (Rock Mech Rock Eng 38:373–398, 2005). In this paper, Isaksson and Stille’s probabilistic time and cost estimation model was improved and then applied to estimate the total tunneling time of the headrace tunnel in the Uri hydropower project in India. The improvements allow the user to more accurately account for different types of geological features and disruptive events. The result of the estimation is a distribution of tunneling time. The outcome illustrates how a proper understanding of the geological setting of the project and its effect on construction performance can contribute to effective risk management.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.