Abstract
This paper is the second in the series dealing with probabilistic station strain bus uprating. The paper describes the formulation, computational procedure, and analytical techniques for evaluating insulator assembly failures due to conductor bundle collapse and conductor swingout. In addition, the problem of conductor clearance has been formulated to determine the probability of interphase flashover. This paper provides detailed descriptions of all the steps involved in the comprehensive probabilistic analysis and presents an application of this technique to a real case of a transformer station (Middleport TS) in Ontario Hydro's power system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.