Abstract

When the wind farm is planned to be constructed, making full use of wind power resources is mainly considered while the acceptable capacity of wind power integrated into tie line is taken insufficient account, causing that the wind power would not be accepted completely and the wind power forecast is limited by the acceptable capacity of tie line. Under the current operation mode, the next-day network load flow is based on the wind power forecast. Because of the inevitable forecast errors in wind generation, the wind power probability distribution would always be given. Considering the acceptable capacity of power grid, the wind power is fitted to distribute irregularly. The irregular distribution input does not satisfy the demand of classical numerical probabilistic load flow calculation. This paper proposes a probabilistic load flow calculation method based on proportional allocation principle and Latin hypercube sampling, which ensures high calculation precision and improves the speed dramatically. The veracity and validity of the method proposed is tested in the IEEE 118-bus system. The irregular probability distribution of wind power is fitted under the restriction of tie line and the simulation results show that the method proposed also has excellent practical value.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.