Abstract
The earned value method (EVM) is recognized as a viable method for evaluating and forecasting project cost performance. However, its application to schedule performance forecasting has been limited due to poor accuracy in predicting project durations. Recently, several EVM-based schedule forecasting methods were introduced. However, these are still deterministic and have large prediction errors early in the project due to small sample size. In this paper, a new forecasting method is developed based on Kalman filter and the earned schedule method. The Kalman filter forecasting method (KFFM) provides probabilistic predictions of project duration at completion and can be used from the beginning of a project without significant loss of accuracy. KFFM has been programmed in an add-in for Microsoft Excel and it can be implemented on all kinds of projects monitored by EVM or any other S-curve approach. Applications on two real projects are presented here to demonstrate the advantages of KFFM in extracting additional information from data about the status, trend, and future project schedule performance and associated risks.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.