Abstract

<p class="NoSpacing1">SMR NPP is an alternative to overcome the dependency to diesel power plant especially in outside Java Bali system. Economic analysis is a crucial thing that should be done prior to any investment decision on the SMR NPP project and generally done by calculation of Levelized Unit Electricity Cost (LUEC). NPP projects, include SMR, are vulnerable to a number of uncertainty variables. The goal of this study was to perform economic analysis of SMR NPP project with capacity 2 x 100 MWe in Indonesia by incorporating an amount of uncertainty variables, namely the probabilistic approach. The research method is calculating LUEC with deterministic approach followed by the probabilistic approach. Probabilistic approach is done by simulating the effect of uncertainty variable on LUEC using Monte Carlo simulation technique. The results show that the deterministic approach with a discount rate of 10% obtained LUEC at 12.87 cents US$/kWh. Whereas the probabilistic approach obtained LUEC of 13.10 plus minus 1.43 cents USD/kWh at a discount rate of 10% and amounted to 8.11 plus minus 0.88 cents USD/kWh at a discount rate of 5%. calculation in deterministic approach was 12.87 cents USD/ kWh. While LUEC as the results of uncertainty variables simulation on probabilistic approach were 13.10 ± 1.43 cents USD/ kWh on discount rate 10% and 8.11 ± 0.88 cents USD/kWh on discount rate 5%. Occurrence probability of LUEC is less than 13 cents USD/kWh (benchmark value) was about 100% on discount rate of 5% and 50% on discount rate of 10%.<a href="file:///C:/Users/Mohamad%20Mostafa/Desktop/Knowledge%20E/In%20Press%20Conferences/ICoNETS-2015/Source-Manuscripts/19_L04-Nuryanti_p128-135.docx#_msocom_1">[P1]</a> </p><div><hr align="left" size="1" width="33%" /><div><div><p> <a href="file:///C:/Users/Mohamad%20Mostafa/Desktop/Knowledge%20E/In%20Press%20Conferences/ICoNETS-2015/Source-Manuscripts/19_L04-Nuryanti_p128-135.docx#_msoanchor_1">[P1]</a>Revised sentence</p></div></div></div>

Highlights

  • The main characteristics of the electricity system outside Java-Bali are: limited grid and still dominated by diesel power plants

  • Considering the investment cost has been spent before the operation periods of the plant, in Levelized Unit Electricity Cost (LUEC) calculation this investment cost should be discounted with a certain discount rate along lifetime of plants with a certain discount rate so that it become the annual value

  • These results indicate a need for a strong commitment from the government to provide a government guarantee on Small Medium Reactor (SMR) NPP project, such as manifested by using low/ social discount rate

Read more

Summary

Introduction

The main characteristics of the electricity system outside Java-Bali are: limited grid (isolated areas) and still dominated by diesel power plants. Fuel price fluctuation as well as fuel supply chain up to the diesel location become a problem that lead to the high cost of electricity power generation in this region. Small Medium Reactor (SMR) could be an alternative to overcome the dependency of isolated areas to oil-fired power plants, because this reactor type was focused on the limited grid region [2,3]. How to cite this article: Nuryanti, Suparman, “Probabilistic Analysis on Levelized Unit Electricity Cost (LUEC) Calculation of Small Medium Reactor Nuclear Power Plant (SMR NPP) in Indonesia,” KnE Energy, vol 2016, 10 pages.

Objectives
Methods
Findings
Discussion
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.