Abstract

In this paper, we present part of a study on stochastic, dynamic project scheduling in an R&D Department of a leading home appliances company in Turkey. The problem under consideration is the preemptive resource constrained multi-project scheduling problem with generalized precedence relations in a stochastic and dynamic environment. The model consists of three phases. Phase I of the model provides a systematic approach to assess uncertainty resulting in activity deviation distributions. In Phase II, proactive project scheduling is accomplished through two different scheduling approaches, which employ a bi-objective genetic algorithm. Phase III is the reactive project scheduling phase aiming at rescheduling the disrupted project activities. Here, we will limit our presentation to Phase II - the proactive project scheduling phase. The procedure is demonstrated through an implementation with real data covering 37 R&D projects. Computational study is performed to compare the two different scheduling approaches called single and multi-project scheduling approaches, as well as two different chromosome evaluation heuristics. Results are presented and discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.