Abstract
Resource allocation is a critical issue in building construction project scheduling. CPM/PERT schedules without resource allocation are today inadequate for baseline control. One major concern in resource allocation is the determination of a priority ranking for all activities that are candidates for assignment. In this paper, an expert system PRIORITY RANKING, which uses possibility theory and the generalized modus ponens logic inference rule to determine the priority ranking, is described.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.