Abstract

Energy has been an essential factor in determining the governments’ policies. The countries had to produce their own energy to decrease dependency on external resources. That also provided to gain a great importance on investment on power plants. In this study, a multi-objective Mixed-Integer Linear Programming (MILP) model synchronously optimizing five targets determined as decreasing carbon dioxide (CO_{2}) emission, increasing power consumption, increasing power plants, increasing energy generation and installed capacity was used. In described model, it was solved by considering renewable power plants in Turkey and fossil fuel-based power plants having most share in Turkey. By trying to minimize deviation values of Turkey’s 2023 targets, it aimed to determine which power plants need to be increased. To determine the priorities of these targets, Ranking Approach for fuzzy numbers by Liou and Wang (1992) was used. Besides, Fuzzy Analytic Hierarchy Process (AHP) was used to prioritize investment planning of renewable power plants in Turkey and five different kinds of power plants under the visual pollution criteria based on amount of CO_{2} emission released, environmental damage, capital costs, space requirement and provided employment were evaluated.

Highlights

  • Energy is one of the most essential factors for a country’s social welfare and sustainable development

  • Multiple criteria decision making (MCDM), with the briefest definition, is a general name given for problem-solving of multiple and conflicted criteria to be achieved

  • The most advantageous side of this method is that calculation requirement is low and it does not need any additional process by following the steps of classical Analytic Hierarchy Process (AHP)

Read more

Summary

Introduction

Energy is one of the most essential factors for a country’s social welfare and sustainable development. Fuzzy Analytic Hierarchy Process (AHP), which is one of the multiple criteria decision-making methods, was used. By considering environmental damage of power plants, capital costs, space requirement, their advantages and used technological development under the main criteria of social acceptance, the power plants in Turkey were ranked and an order of preference was composed. How many power plants should be built was determined with fuzzy-weighted goal programming method by considering Turkey’s installed capacity, number of power plants, energy generation and targets of demands in 2023. Analytic Hierarchy Process and goal programming that are multiple criteria decision-making methods and fuzzy conditions of these methods were described. Later, it continued with an application and the results were included

Literature search
Multiple criteria decision making
Triangle Fuzzy numbers
Power consumption increased
Reciprocal values
The Preemptive Goal Programming application
Power plants The number of current power plants
Fuzzy AHP application
Hydro Wind Geothermal Solar Biomass
Findings
The conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.