Abstract

Power line communication (PLC) has been selected by ISO/IEC 15118 as standard technology for vehicle-to-grid communication. Communication traffic to charge an electric vehicle should have a higher priority than normal traffic in order to improve the reliability and delay performance. To this end, HomePlug Green PHY, which is a standard PLC defined in ISO/IEC 15118, provides such a priority resolution scheme. However, when there is a hidden station with respect to the high-priority station, the priority resolution scheme does not operate properly, resulting in a higher delay or losses of high-priority traffic. This paper briefly analyzes the priority inversion probability under the hidden station problem and proposes a priority inversion prevention scheme. The adverse effect of the priority inversion problem is demonstrated through a numerical analysis and extensive simulations. We also show that our proposed scheme not only solves the problem but also improves the performance of the other stations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call