Abstract
The volume of sedimentation in the Bengawan Solo river is 592,936.05 m3 per year. Several check dams have been built to overcome the sedimentation problem. However, this check dam building has experienced a decrease in performance due to sedimentation. Therefore, the research in this thesis aims to determine the priority of maintenance and repair of sediment control buildings (check dams). Determining priorities due to lack of budget for buildings processed by the government. Use guidelines for classifying check dam damage and building maintenance. Determining maintenance priorities based on the condition of the building using the analytical hierarchical process method. The location of the case study is a check dam building on the Bengawan Solo River and the results of the analysis show that the one with maintenance and repair priorities is the ploso check dam with severe damage (42.5%) and the maintenance carried out is rehabilitative (performance <60%).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.