Abstract

Article history: Received February 25, 2016 Received in revised format: March 28, 2016 Accepted May 19, 2016 Available online May 21 2016 A key indicator to evaluate the success of an organization is the degree of meeting specific civil project goals based on a predetermined schedule. Therefore, the main purpose of this paper is to evaluate the performance of governmental administration agencies based on realization of civil project goals. In this paper, the information published by the President Deputy of Strategic Planning and Control, that publishes an annual report of evaluation indicators for national civil development projects, are used to evaluate and prioritize the major and non-major governmental agencies. Also, the Gray Relational Analysis (GRA) and the TOPSIS method are employed to analyze the data. The results indicate that using the GRA method, Supreme Council of Seminary and using the TOPSIS method, The Ministry of Labor and Social Affaires have gained the highest ranking. cience Ltd. All rights reserved. Growing S 6 © 201

Highlights

  • One of the main tasks of the President Deputy of Strategic Planning and Control is associated with supervising the civil operations and reporting on the progress of the projects funded by the governmental civil and current credits

  • The results indicate that based on the Gray Relational Analysis method, The Supreme Council of Seminary, The Ministry of Labor and Social Affairs, and the Ministry of Welfare and Social Security respectively have gained the first, second and third rankings

  • The results obtained from the two methods of the analysis of Gray Relational Analysis (GRA) and TOPSIS were somewhat different, because the gray system theory was used to solve obscure problems and discrete data and issues that have incomplete information

Read more

Summary

Introduction

One of the main tasks of the President Deputy of Strategic Planning and Control is associated with supervising the civil operations and reporting on the progress of the projects funded by the governmental civil and current credits. The supervision information gained from the evaluation of the governor’s experts is used to set the reports as well as the information from the latest agreements exchanged in the President Deputy of Strategic Planning and Control. Among the multiple approaches to conflict management, Multi Criteria Decision-Making (MCDM) is very common. Multi Criteria Decision Making process can be a complex and dynamic process at the engineering and managerial level. Civil development projects are classified into constructions, development, equipment, repair, design studies, fundamental studies, detailed design, supervision, services and obligations projects (President Deputy of Strategic Planning and Control, 2014).

Objectives
Methods
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.