Abstract

In difficult economic times, companies sometimes delay the performance of maintenance on electrical power distribution equipment to save costs. If this happens, some circuit breakers or protective relays will miss their scheduled maintenance and testing. This can create a significant safety risk, if those protective devices are used to manage arc flash hazards. This paper describes a study method to determine which circuit breakers and protective relays in a system are the most critical, so they can be prioritized for continued proper maintenance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.