Abstract

AbstractPrioritization of watersheds has gained more importance in natural resources management, particularly in the context of watershed management. Flooding potential is one of the main indices used to prioritize watersheds. The objective of this study is to investigate the Pol‐Doab Shazand Watershed flooding conditions as a result of land use change and prioritization of its subwatersheds using rainfall – runoff data. For this purpose, after computation of design flow with different return periods, factor analysis technique was applied to determine the best flow with proper return period towards evaluation and prioritization of subwatersheds. The results showed that the design flow with 25‐year return period (Q25) is suitable. The results indicate that subwatershed 22 is the highest priority because of large changes in peak flow, and subwatershed 2 given the lowest priority since changes in peak flow is the lowest.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.