Abstract

Risk management plays a vital role in ensuring the safety and efficiency of tunnel construction by considering various factors, including uncertainties associated with concurrent adverse sources. One key aspect of risk management is prioritizing hazardous zones to devise an optimal countermeasure plan within time and cost constraints. This study developed an advanced tunnel risk management model, combining the analytic hierarchy process (AHP) and fuzzy set theory (FST). The model derived the impact using AHP and the probability using FST. By selectively combining causal factors that met the selection criterion, the risk of each hazardous zone was determined, enabling the prioritization of identified hazardous zones. The model application results indicated that causal combinations associated with significant tunnel convergence posed a relatively high risk. Moreover, the hazardous zones where unstable ground formations were excavated by a gripper tunnel boring machine (TBM) were revealed as the most vulnerable locations. Consequently, adopting a shield TBM or implementing ground reinforcement is recommended. Overall, the developed model effectively prioritizes identified hazardous zones and provides an optimal countermeasure plan, contributing to the overall safety and efficiency of the operations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.