Abstract

Article history: Received March 2, 2012 Received in Revised Format March 18, 2013 Accepted March 20, 2013 Available online April 1 2013 An important problem in control chart implementation is the availability of resources to collect and analyze data for control charts implementation. This paper proposes a method to prioritize and select final product parameters to control. The prioritization is based on cost of quality and technical criticality of those parameters. The prioritization method is demonstrated by a case study of flexible printed circuit manufacturing. © 2013 Growing Science Ltd. All rights reserved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.