Abstract
The Palisades nuclear plant has developed a comprehensive inspection program to support safe, reliable, and cost-effective operation of all Alloy 600 nozzles and safe ends in the primary coolant system (PCS). As a part of the Palisades Alloy 600 Project, an inspection prioritization scheme was developed to help the plant focus its resources on high-risk components and plan appropriate inspection activities for the other components. The inspection prioritization scheme is based on the susceptibility of the components to primary water stress corrosion cracking (PWSCC), component failure consequences, component leak detectability and component radiation exposure. The scheme provides a simple, systematic and technical base for selecting Alloy 600 components for inspection. The scheme, however, could be used to develop an inspection schedule or to select the highest priority components for mitigation or replacement.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.