Abstract

One of the key challenges engineering managers face is how to enhance the level of performance of their employees. Existing guidelines and tools regarding the implementation of an incentive plan do not cover the primary design considerations sufficiently. This research identifies thirteen primary incentive plan design considerations (PICs), the most important considerations that must be taken into account in the design or development of an incentive plan, through a systematic and structured identification process. The thirteen PICs are a unique amalgamation from influential research papers that deal with incentives and motivation from various disciplines. These considerations can be used by engineering managers, in conjunction with existing guides or toolkits, as an aid during the design, review, or implementation of an incentive plan.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.