Abstract

Heat recovery systems installed in Air Handling Units (AHUs) are energy efficient solutions during disparate outdoor-to-indoor temperatures. However, they may be detrimental in terms of a primary energy balance when these temperatures get closer, due to the decrease in the thermal energy recovered compared to the global energy consumption required for their operation. AHUs in surgical areas have certain particularities such as their continuous operation throughout the year, the large airflows supplied and the strict exigencies on the supply air quality, avoiding any cross contamination. This work presents the measurements and analysis performed on a coil heat recovery (run-around) loop system installed in the AHU that serves a mixed-air ventilation operating room in a Hospital Complex. A primary energy balance is studied, including the thermal and electric energy savings achieved, considering the electric energy consumption by the recirculation pump and the additional power requirements of fans due to the pressure drop introduced. The obtained value is then used to predict the thermal energy savings achieved by the heat recovery system. Results are extrapolated to the Typical Meteorological Year to provide an order of magnitude of the primary energy and CO2 emissions saved through the operation of the coil heat recovery system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.