Abstract

Collecting and remanufacturing worn-out products provide significant financial advantages. In this research, we examine how remanufacturing worn-out ball and gate valves, which are important pieces of equipment in the oil and gas industry, could improve the profitability of the closed-loop supply chain. In this regard, four different scenarios for collecting and remanufacturing processes are considered: (1) the manufacturer collects the worn-out product from the consumers and remanufactures them, (2) the retailer collects the worn-out products and both manufacturer and retailer remanufacture them, (3) the third party collects the worn-out products and both manufacturer and third party remanufacture them, and (4) the manufacturer collects the worn-out products without remanufacturing them. To formulate the interactions of the CLSC members under the four different scenarios, we use the Nash and Manufacturer-Stackelberg games. Accordingly, the optimal decision variables i.e., the acquisition price, wholesale price, and retail price are calculated under four scenarios. Then, the optimal solutions are compared in four scenarios. In addition, the optimal profit of the closed-loop supply chain and members are obtained under the different scenarios. The results show that in the Nash game, Scenario 2 is the best scenario. However, in the Stackelberg game, Scenario 3 is the best scenario.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.