Abstract
Along with the rapid development of economics and enhancement of industrialization, the power demand keeps rising and frequently creates mismatch between demand and supply in electricity. This provides miscellaneous energy buy-back programs with great opportunities. Such programs, when activated, offer certain amount of financial compensations to participants for reducing their energy consumption during peak time. They aim at encouraging participants to shift their electricity usage from peak to non-peak time, and thereby release the demand pressure during peak time. This paper considers a periodic-review joint pricing and inventory decision model under an energy buy-back program over finite planning horizons, in which the compensation levels, setup cost and additive random demand function are incorporated. The objective is to maximize a manufacturer’s expected total profit. By using Veinott’s conditions, it is shown that the manufacturer’s optimal decision is a state dependent (s, S, P) policy under a peak market condition, or partly an (s, S, A, P) policy under the normal market condition.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.