Abstract

Open transmission access is a new legal requirement within the electric power industry. Interchange will require evaluation of the existing conditions to determine if the product can be delivered at the time required and at the level awarded through the bidding or negotiation process. This paper seeks to identify the likely deregulation details for a full market implementation when native load is considered equal to any other third party load (comparability). This paper seeks to identify the technical issues, such as standards and algorithms, necessary for changing the national infrastructure from a vertically integrated industry to a horizontally integrated industry.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.