Abstract

This paper considers the problem of rescheduling in a decentralized manufacturing system. Flexible manufacturing systems must be able to respond to unexpected disruptions; including schedule disruptions. However, when a cell controller in a decentralized system responds to a disruption, it may disrupt some other cells, because the actions taken at one cell may have some consequence at another cells. In the approach we propose, a controller at a disrupted cell tries to respond in a way which is likely to be least disruptive to other cells, through negotiation with controllers at other cells. This approach, which we call replanning, has the advantage of retaining much of the original distributed plan, while avoiding wide propagation of the disruption through the rest of the system. We apply this concept to the domain of distributed factory rescheduling, and describe PRIAM (polite rescheduler for intelligent automated manufacturing), a polite rescheduling architecture which is currently under development. Simulation results show that the use of negotiation in polite rescheduling prevents the wide propagation of disruption from an initial local disruption.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.