Abstract

When maintenance models are developed for complex continuous operating systems, with large production losses, it is important to take into account the maintenance duration, in order to provide an effective maintenance program. In this work, a preventive maintenance model is presented in order to coordinate the component replacements in a multi-component system. The model is based on the partial periodic renewal policy. At each partial renewal, a group of components to be replaced is defined. When all components are replaced simultaneously, we consider that the system undergoes an overhaul which resets it to the new state. Moreover, the model takes into account for non-negligible replacement times, where different assumptions are considered. The relevant effect of maintenance times on the optimal policy is clearly shown by the numerical results, provided by the application in an oil refinery.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.