Abstract
Scheduling policy towards a machine or equipment that merely considers component lifetime will be difficult to be performed to a machine that has a complex mechanical structure. That problem causes ineffective maintenance time and enormous maintenance cost. Aforementioned problem can be solved by applying a preventive maintenance method using a modularity design approach. Modularity design method considers the linkages between machine components so that they can be classed into a new maintenance module. This method can help an enterprise in reducing maintenance cost and optimizing the time to carry out the preventive maintenance activity so that the machine reliability and productivity will increase.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.