Abstract

In a mineral processing plant, the determination of a preventive maintenance schedule is one of the most important maintenance policies. In this study, to determine the preventive maintenance schedule for the Emet Colemanite Mineral Processing Plant in Turkey, a mean quality control chart was constructed using the historical concentrate B2O3 grade data. The effect of preventive maintenance scheduling on B2O3 grades was monitored using the mean quality control chart. It was determined that recovery increased after each preventive maintenance scheduling. Close examination of the mean quality control charts indicated that there were three periods that showed different grade characteristics. These were identified as the period “prior to preventive maintenance,” the period “after preventive maintenance” and the period “requiring preventive maintenance.” These periods were compared as two independent samples by using the Kolmogorov-Smirnov test. Application of this test for interpretation of the mean quality control chart enabled the authors to analyze the system effectively, and it showed that the preventive maintenance for this plant should be scheduled at four-month intervals.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.