Abstract

Traditionally, production and maintenance – two major objectives of manufacturing systems – are not coordinated. Production is often interrupted by pre-scheduled preventive maintenance (PM) without considering the throughput target, and PM tasks are not cost-effectively conducted. This paper investigates the extra hidden opportunities for PMs during production time without violating the system throughput requirement. We develop a prediction model to identify such PM opportunity windows for large production systems based on real-time factory information system data.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.