Abstract

The existed PM (preventive maintenance) efforts on multi-component systems usually ignore the PM opportunities at the component failure moments and the structure dependence among the system components. In this paper, a time window based PM model is proposed for multi-component systems with the stochastic failures and the disassembly sequence involved. Whenever one of the system components stochastically fails or reaches its reliability threshold, PM opportunities arise for other system components. A Monte-Carlo based algorithm is built up to simulate the stochastic failures and then to calculate the cumulative maintenance cost of the system. The optimal PM practice is obtained by minimizing the cumulative maintenance cost throughout the given time horizon. Finally, a numerical example is given to illustrate the calculation process and the availability of the proposed PM model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.